Close Menu
MyGhanaDaily
    Facebook X (Twitter) Instagram
    MyGhanaDaily
    Sunday, October 5
    Trending
    • The People’s Poet Speaks Again – Omar Sterling Announces VTH 2 Mixtape
    • The Business Side of Ghanaian Music Nobody Talks About
    • Top 10 Rap Verses in Ghanaian Hip-Hop History
    • Best Ghanaian Music Videos of All Time
    • Top 10 Ghanaian Throwback Songs That Still Hit Today
    • Absa Bank Ghana hosts Strategic Dialogue on Ghana’s 24-Hour Economy initiative
    • Edem Sickle Cell Foundation partners NCCE mark sickle cell awareness month
    • TMA embarks on Tema Facelift Campaign
    Your Marketplace Banner
    • News
    • Business
    • Entertainment
      • Music
      • Movies
      • Fashion
      • Celebrity news
    • Sports
    • Health
    • Technology
    • Agriculture
    • Opportunites
    • Videos
    • More
      • Education
      • Tourism
      • History
      • Feature
      • Opinion
      • World
    MyGhanaDaily
    Home»Business»President Akufo-Addo commissions 6.5-megawatt solar power plant
    Business

    President Akufo-Addo commissions 6.5-megawatt solar power plant

    myghanadailyBy myghanadailyOctober 12, 2020No Comments3 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    26643933

    President Nana Addo Dankwa Akufo-Addo on Saturday, October 10, 2020 commissioned a 6.5-megawatt solar power plant, located in Lawra in the Upper West Region.

    It will be recalled that on Tuesday, February 4, 2020, the President was in Kaleo, in the Nadowli District, to cut the sod for the construction of two solar power projects, one in Kaleo and the other Lawra, both in the Upper West Region.

    Send your stories to Email: myghanadaily@gmail.com • WhatsApp: +233 577 145 140

    “I indicated, at the time, that, once completed, these two projects will deliver a combined power supply of about twenty megawatts to the national grid. Eight months on, I am happy to commission the first of the power projects which has been completed, and that is the 6.5-megawatt Solar Power Project, here in Lawra,” President Akufo-Addo said.

    The ceremony, according to him, reaffirms the commitment of government to diversify the country’s energy generation portfolio, and, thereby, help increase the renewable energy component of our energy mix, and contribute to our fight against the effects of climate change.

    “The completion of this project in Lawra should remind all of us that the government of Nana Addo Dankwa Akufo-Addo delivers on its promises,” he added.

    The President continued, “As I indicated at the sod cutting ceremony, this solar plant is the first of its kind ever to be established in the Upper West Region. This means the Upper West Region has now its fair share of power generation facilities in the country.”

    He was confident that the solar plant at Lawra and Kaleo, whose combined output is sufficient to meet a significant portion of the electricity demand in the Upper West Region, will help support local small and medium scale enterprises, as well as enhance other socio-economic activities.

    Further, the President stressed that it will help reduce transmission losses on our national grid, and improve the reliability of the distribution system in Lawra and its environs.

    “I am pleased that the Contractor, in the process of constructing this plant, employed some one hundred (100) people from communities within the Lawra District. I am expectant that persons, particularly the youth, with the requisite technical skills, would be recruited for the operation and maintenance phase of this facility,” he said.

    President Akufo-Addo continued, “It is gratifying to learn that the Volta River Authority (VRA) will ensure that this facility becomes a source for practical studies on solar power operations by Technical Universities in the Regions of the northern sector of Ghana.”

    As part of their corporate social responsibility to the community, both VRA and Elecnor, the Project Contractor, have undertaken to provide smaller installations of solar power as back-up power to some specific facilities in the community, namely the Lawra Hospital, Municipal Police Command, and a stand-alone system to the Lawra Paramount Chief’s palace.

    To this end, the President applauded VRA and Elecnor for their leadership and commitment to the welfare of the people of Lawra, and applauded them for delivering the project ahead of schedule, in spite of the challenges posed by COVID-19.

    “The Ghanaian people are very grateful to the German Government for providing the twenty-two million-euro funds for the Project. I look forward to the early conclusion of the negotiations for the second phase of this Project, whose discussions are currently ongoing,” he added.

    Source: www.ghanaweb.com

    Send your news stories to
    Email: myghanadaily@gmail.com • WhatsApp: +233 577 145 140
    Advertise with us | Follow our WhatsApp channel for more news
    Business
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleICUMS generates GH¢3.65 billion revenue in 3 months – Ghana Revenue Authority
    Next Article MPs cannot continue to die; We need protection – Mensah-Bonsu
    myghanadaily

    myghanadaily is managed by the Publishing Desk. You can reach us via email; info@myghanadaily.com

    Related Posts

    Absa Bank Ghana hosts Strategic Dialogue on Ghana’s 24-Hour Economy initiative

    October 4, 2025

    Opportunity International Hosts Africa GABV Meeting in Accra

    September 30, 2025

    Ghana Gas seeks 91% tariff increase to expand,

    September 10, 2025
    LATEST NEWS
    • The People’s Poet Speaks Again – Omar Sterling Announces VTH 2 Mixtape
    • The Business Side of Ghanaian Music Nobody Talks About
    • Top 10 Rap Verses in Ghanaian Hip-Hop History
    • Best Ghanaian Music Videos of All Time
    • Top 10 Ghanaian Throwback Songs That Still Hit Today
    SPORTS NEWS

    2026 FIFA WCQ: Ghana beats Mali

    September 9, 2025

    The Black Stars Podcast: A six-part dive into Ghana’s football history, struggles and sparks of glory

    August 30, 2025

    2026 World Cup qualifiers: Black Stars set to open camp on September 1

    August 27, 2025

    Felix Afena-Gyan Joins Amedspor on Season-Long Loan

    August 21, 2025

    Ayew Stays Positive as Foxes Target Quick Response

    August 21, 2025
    Recent Posts
    • The People’s Poet Speaks Again – Omar Sterling Announces VTH 2 Mixtape
    • The Business Side of Ghanaian Music Nobody Talks About
    • Top 10 Rap Verses in Ghanaian Hip-Hop History
    • Best Ghanaian Music Videos of All Time
    • Top 10 Ghanaian Throwback Songs That Still Hit Today
    Like Us On Facebook
    Facebook Pagelike Widget
    • Facebook
    • Twitter
    • Instagram
    © 2019 -2025 Copyright | MyGhanaDaily.com

    Type above and press Enter to search. Press Esc to cancel.